Installation and examples

Insulation Sleeves

Insulation Sleeves

1. Cut off a vertical line on the side of insulation sleeve

Correct Wrong



2. Sizing on both sections and then cohere after 5~10 minutes

Correct Wrong


3. Pull hard to make every part connect completely and seamlessly
Correct Wrong


4. Sizing on both sides to adhere two insulation sleeves completely
Correct Wrong
***Length of insulation sleeves must be long enough to adhere completely.
After that, use insulation tapes (3 thk x 25 wide) to wrap up connecting area.

Double Layers of Colex Insulation Sleeve

1. Construction of Double Layers of insulation sleeve

Correct Wrong
***cutting lines and connecting lines cannot overlap with each other.

2. Use Aluminum foil (colored) or other metal jackets to wrap up insulation
sleeves, better not to wrap them by tapes only
Correct Wrong

3. Remain enough space between two insulation sleeves
Correct Wrong
Construction of Elbow
Correct Wrong
*** the distance between two insulation sleeves should remain 10cm over
Construction of Tee and Valve
Correct Correct
Installation for chilling water pipe in air conditioning system
(Vertical Pipes)
(Horizontal Pipes)