EnglishTraditional Chinese
WORLDWIDE
Facebook
Twitter
YouTube
Skype
Florex Insulation
  • Company Profile
  • Product
    • Colex Insulation Material
      • COLEX Insulation Sheets
      • COLEX Insulation Sleeves
      • PE Foam Tape
      • PE Foam Profile
      • EVA foam Tape
    • Florex Pipe Support
    • Electronic Descaler
    • Nano Photocatalyst
    • Thermal Pad
    • Water Treatment Chemicals
  • Application
    • Electronic Descaler
      • Video
      • Institution
      • Hotel
      • Frozen Factory
      • Industry
      • Laser Cutting Factory
      • Plastic Product Factory
    • COLEX Insulation Sleeves
      • Cold Insulation of COLEX Insulation Sleeve in refrigerant food plant (-50°C)
      • Cryogenic Pipeline -40°C Liquid Ammonia pipeline
      • Liquid Nitrogen Pipeline(-196°C)
      • Failure Examples without Polyethylene foam material
    • COLEX Insulation Sheets
      • Petrochemical Storage Tank
      • Refrigerating Warehouse (-40°C)for seafood
      • Roof Insulation
      • Low Receiver Insulation
    • Florex Pipe Support
  • Installation
    • Colex Insulation Sleeves
    • Colex Insulation Sheets
    • Florex Pipe Support
  • Contact Us
  • News

SHENHO 330

SLIME REMOVER

SHENHO 330SLIME REMOVER

SHENHO 330 SLIME REMOVER

PRINCIPAL USE:

Due to the changeable climate circumstance, water pollution, bacterial in air and the environmental factors around cooling tower will bring the significant amount of bacterium in the re-circulating cooling water easily.  Besides, they will cause the growth of algae in cooling tower and deposit of slime inside the pipeline of heat exchanger.  Such problem will be especially serious to the cooling system of Refrigerant Food Plant and Ferment Factory.  SHENHO 330 is the agent mainly to clean that algae and slime existed in the cooling system.

FEEDING & DOSAGE:

COOLING TOWER DOSAGE COOLING TOWER DOSAGE
10 RT 0.5 Pail 150 RT 7 pails
20 RT 1 pail 175 RT 9 pails
40 RT 2 pails 200 RT 11 pails
80 RT 3 pails 250 RT 13 pails
100 RT 4 pails 300 RT 17 pails
125 RT 5 pails 350 RT 18 pails
  1. Keep cooling water circulating continuously(unnecessary to stop the system). Pour Agent A into cooling tower to circulate for 1~2 hours.
  1. Thump SHENHO 330 into cooling tower and circulate for 2 days continuously. To keep the effect of SHENHO 330 be workable, don’t make the cooling water flow over its system during the 2-day circulation.(Clean the inlet filter of circulating pump carefully to prevent the block of filter and cause the water lost from circulating pump.)
  1. Drain off clean agent from system completely after the 2-day circulation, and then flush cooling tower by water to make the loose and dead algae drop out and drain off from system entirely.
  1. Replace new water and re-start the system.

 

SHENHO 29
SHENHO 29
PENETRATE-P
PENETRATE-P

Address :311, TA SHUN 3RD ROAD, KAOHSIUNG, TAIWAN, R.O.C
Tel:886-7-3846968
Fax :886-7-3828047
E-Mail :colex@ms16.hinet.net